Cabramatta Endoscopy Unit

Client
Gastroenterology Specialist Centre
Architects
Ark Express
Year
2021
Program
10 Months
Status
Current
Budget
$2.9m

Gallery

The Project

Verity Construction are excited to be building the new Cabramatta Endoscopy Unit! 

Designed by Ark Express, the design of the building includes a single level basement, with a single-storey Endoscopy Unit containing consulting rooms, operating theatres and a recovery area. The front façade utilises decorative concrete panels and hexagon aluminium panels to create a distinctive appearance.