Category


Childcare

Eastwood Childcare Centre

Gallery The Project Verity are proud to confirm that we have been appointed to build the Eastwood Childcare Centre for Little Leo’s Early Learning. The design by Arquero includes a single level basement with two levels of early learning spaces for up to 88 children.  

Picton Childcare Centre

Gallery The Project Verity completed the 64 place Picton Childcare Centre, located in picturesque Picton, NSW for Little Leo’s Childcare.  Designed by Envision Group the project involved constructing a raised ground floor slab to accommodate the flood path requirements, strict compliance with the bushfire standards, and a stunning outdoor play area.

Vaucluse Childcare Centre

Gallery The Project The Harbour Early Learning, located in Vaucluse, NSW, provides premium Early Learning Education for 97 children. Designed by Supercontext and Danielle Brustman, the construction required excellent planning, building, safety, and quality control to bring this amazing design to life.

Randwick Childcare Centre

Gallery The Project Verity have completed the refurbishment of the historic “Newmarket House” into a beautiful Childcare Centre, located in Randwick, NSW. Designed by Supercontext, the refurbishment involved the construction of an underground basement, two-storey extension, and detailed conservation of heritage elements.

Minna St Burwood Childcare Centre

Gallery The Project Verity Construction successfully delivered the Minna Street Burwood Childcare Centre in Burwood, NSW, in 2023.  Designed by Artmade Architects, this centre has a beautiful heritage-inspired brick facade and themed classrooms with warm natural tones. This centre is a stand-out.

Bossley Park Childcare Centre

Gallery The Project Verity Construction successfully delivered the Bossley Park Childcare Centre in Bossley Park, NSW, for the Montessori Academy Group in 2023. The centre has a single-level basement carpark and a double-storey childcare facility accommodating up to 78 children.  

Narellan Childcare Centre

Gallery The Project Verity Construction successfully delivered the Narellan Childcare Centre in Narellan, NSW, for the Montessori Academy Group in 2023.  The centre has a single-level basement carpark and a double-storey childcare facility accommodating up to 60 children. The centre is designed by Envision Group, and we at Verity Construction are proud to have brought..

Carnes Hill Childcare Centre

Gallery The Project Verity Construction has successfully delivered this spectacular 80-place Childcare Centre for Montessori Academy Group in 2022. The centre is conveniently located in the Holy Spirit Catholic Primary School Precinct in Carnes Hill, NSW. Designed by Supercontext, the building includes an under-croft carpark with a single-storey childcare facility above. The entire front façade is curved,..

Strathfield Childcare Centre

Gallery The Project Verity Construction has successfully delivered this fantastic 47-place Childcare Centre located in the historic suburb of Strathfield, NSW for Montessori Academy Group in 2022.  Designed by Jackson Teece, the building includes a single-level basement with a double-storey childcare facility above. The façade is characterised by a double-pitched roof with a combination of glass, aluminium-timber-look..

Gungahlin Childcare Additions

Gallery The Project Verity successfully completed the conversion of a level 1 shopping centre carpark into a Montessori outdoor play area. Verity were engaged by Montessori Academy Group to undertake this project after having previously completed the original childcare fitout in 2018.  This unique project involved careful WHS and materials handling organisation to ensure there..